Recently Awarded Projects

 

212-North Texas Municipal Water District

Wylie WTP Anhydrous Ammonia Tank Critical Upgrades

This project consists of improvements to the Plant I, II, III and IV anhydrous ammonia storage tanks including replacement of valves, level instruments, gauges and related equipment. Draining, inspection, and testing of the anhydrous ammonia tanks.
$536,750

211-North Texas Municipal Water District

Muddy Creek WWTP Improvements

This project will provide emergency power, replace PLCs and improve odor control at the Muddy Creek Wastewater Treatment Plant.  The following is a brief summary of work: Provide emergency power for the Muddy Creek Waste Water Treatment Plant, 480V, 1500 kW generators, automatic transfer switchgear. Replace 5 PLCs currently located in existing Motor Control Center sections. Replace the foul air handling system using diffused aeration with a bioscrubber.
$5,508,000

210-Brazos River Authority

Morris Shepard Dam

Construction of platforms beneath the two ring jet valves located at the Powerhouse of the Morris Shepard Dam at Possum Kingdom Reservoir in Graford, TX. Platforms will facilitate maintenance access for the valves and will be integrated into the existing concrete structure.
$337,000

209-DWU Walnut Hill Pump Replacement.

Design-Build Project.

As an award-winning local design/build team (DBT) with over 30 years of proven experience with Dallas Water Utilities (DWU),
we are pleased to share our purposed design/build (D/B) Services for the Walnut Hill Pump Station (WHPS) Improvements
Project. Eagle Contracting, LP is the design-builder responsible for the overall project management and coordination of
activities with DWU.

 

5700 Park Vista Cir, Fort Worth, TX 76244, USA

Main Office: (817) 379-1897